JYOPTO / Projection lighting divisionGOBOLIGHT.COM.CN — Catalogue No. 01sales@jyopto.cn · +86 180 5879 1852
Home  /  Middle East

Supply record — Gulf & Middle East

Conformity registration, thermal derating for 50 °C ambient and a freight lane through Jebel Ali.

Gobo projector installation — Middle East
Plate — Middle EastSupply record
Market record

The Gulf combines the strictest conformity registration in the catalogue with the highest thermal load it will ever see. Both belong in the specification.

Markets served: Dubai · Abu Dhabi · Riyadh · Jeddah · Dammam · Doha · Kuwait City · Manama · Muscat

ConformityUAE: ECAS / ESMA documentation support. Saudi Arabia: SASO with SABER certificate of conformity. Qatar, Kuwait, Bahrain and Oman: prepared per consignment.
Mains build230 V / 50 Hz. Type G plug.
Freight laneSea to Jebel Ali or Jeddah, 20–28 days; 10–14 days by air for project deadlines.
ThermalExterior units derated for 50 °C ambient; cleaning interval shortened for fine dust and sand.
DocumentationArabic and English label sets and manuals available, keyed to the certificate of conformity.
Trade termsFOB Ningbo, CFR Jebel Ali or DDP. USD.
§ 02
Field notes / Middle East

What decides the order here.

Documentation, climate and campaign rhythm, in the order they usually matter.

01
§ 01 / Field note

SABER runs before the invoice

A consignment into Saudi Arabia needs a product certificate of conformity registered on SABER before shipment and a shipment certificate before clearance, both raised against test evidence and the commercial invoice, with model codes matched line by line. Registering a full model range once makes later consignments considerably faster; registering only the first unit sold does not.

02
§ 02 / Field note

Fifty degrees is a different thermal problem

A housing rated at 35 °C ambient will not hold its output at 50 °C, and in direct sun the surface runs higher still. Exterior units for this market are quoted with a derating curve against ambient, which in practice means one output step above the European recommendation for the same throw distance, a shaded mounting point where possible, and a shortened cleaning interval because fine sand settles on the lens window and the heat sink.

03
§ 03 / Field note

The calendar runs on the lunar year

Ramadan, Eid al-Fitr and Eid al-Adha carry the campaign year, with national days in December (UAE) and September (Saudi Arabia). Mall atria, hotel lobbies and iftar venues change artwork twice within a month, which makes the multi-pattern carrier the practical answer rather than repeated fabrication. Crescent, lantern and geometric pattern work dominates the seasonal window; dates shift each year and should be planned against the lunar calendar, not the Gregorian one.

§ 03
Seasonality / record

The calendar that drives demand.

Artwork approved late is artwork that misses the season.

PeriodSeasonal demand and ordering window
Ramadan & EidCrescent, lantern and geometric patterns; the largest seasonal window, dated by the lunar calendar.
SeptemberSaudi National Day; green-and-white pattern work for retail and government venues.
DecemberUAE National Day and the winter tourist season; hotel and mall installations.
May – AugIndoor work dominates; exterior installation scheduled for evening hours.
§ 04
Models / extract

Models from the index sold in this market.

Extracted from the full index; specification tables are on each model page.

Model index

No.PlateCodeDesignationOutputNotes
01 HP-300 Large-Format Gobo Projector HP-300 Large-Format Gobo Projector 300 WEven illumination across very large surfaces for landmark and festival work. →
02 HP-1500 Long-Throw Industrial Projector HP-1500 Long-Throw Industrial Projector 1500 WThe highest-output unit in the range, built for tower and billboard-scale graphics. →
03 SF-50 Crosswalk Marking Projector SF-50 Crosswalk Marking Projector 50 WHigh-contrast crossing lines placed on the ground without paint. →
§ 05
Enquiry / record

Questions answered before ordering.

Anything not covered here goes to the enquiry form and is answered within one working day.

Can a SASO certificate be raised through SABER?

We support the process: the product certificate is registered by the exporter or the Saudi importer against test reports and product data, and we supply the technical file and sample documentation. Allow two to four weeks for first registration of a model range, and confirm the exact model codes before the invoice is raised.

What does 50 °C ambient do to the output?

As a working rule, a fixture at 50 °C ambient delivers roughly 75–85 % of its 25 °C rated output and needs more frequent cleaning. Each exterior model is quoted with its own derating figure so the wattage is chosen against the site condition, not the catalogue number.

Are Arabic manuals and labels available?

Yes, on request: rating label, manual and packaging text in Arabic and English, with the model code format agreed so the labels match the certificate of conformity.

Enquiry / No. 01

Specify for Middle East.

Send the distance, the surface and the artwork. The reply includes the model, the documentation route and a landed-cost estimate.

Open an enquiry →
GOBO
↑