JYOPTO / Projection lighting divisionGOBOLIGHT.COM.CN — Catalogue No. 01sales@jyopto.cn · +86 180 5879 1852
Home  /  Europe & the UK

Supply record — Europe & the UK

Documentation sets, mains builds and freight lanes for European enquiries. Read alongside the technical guide.

Gobo projector installation — Europe & the UK
Plate — Europe & the UKSupply record
Market record

European orders are decided by documentation and mounting conditions before they are decided by price. The record below is what the importing side will ask for first.

Markets served: Germany · France · Netherlands · Belgium · Spain · Italy · Poland · Sweden · United Kingdom · Ireland

ConformityCE documentation set issued with each consignment; UKCA set for the United Kingdom. Test-report extracts and declarations of conformity available on request.
Mains build220–240 V / 50 Hz standard. Type C/F plug; Type G for the UK and Ireland.
Freight laneSea to Rotterdam or Hamburg, 30–40 days; rail to Duisburg or Małaszewicze, 18–24 days.
Trade termsFOB Ningbo, DAP or DDP. EUR or USD quotations, Incoterms 2020.
DocumentationManuals, rating labels and packaging in English; localised sets available per order.
DeskEnquiries received before 10:00 CET are answered the same working day.
§ 02
Field notes / Europe & the UK

What decides the order here.

Documentation, climate and campaign rhythm, in the order they usually matter.

01
§ 01 / Field note

What the file must contain

A European electrical contractor will not connect an undocumented fixture, and the importing side carries the conformity file. The set we issue covers the declaration of conformity, a RoHS declaration and the test-report extract referenced to the model code on the order. Because housings and optical trains are produced in one facility, a model range is documented once and referenced on later consignments; confirm at quotation that the file covers the exact model codes on the invoice.

02
§ 02 / Field note

Projected marks where fixing is not permitted

A large share of European frontage work happens on buildings where a physical sign cannot be fixed — listed facades, leased frontages, streets under municipal signage rules. Projection separates the message from the building: the fixture sits on a ground stand or an existing pole, the mark lands on the pavement or the wall, and a seasonal change is a glass disc rather than a planning application. This is why the exterior series carries most of the European volume, with IL interior units for hospitality interiors.

03
§ 03 / Field note

Condensation, not rain

The exterior failure mode in a northern European winter is moisture drawn across the gobo as the housing cools overnight. OL series bodies are gasketed and assembled with desiccant and a breather element for this reason. Where a fixture is mounted close to a heat source or above a kitchen extraction, allow for a higher moisture load and shorten the service interval accordingly.

§ 03
Seasonality / record

The calendar that drives demand.

Artwork approved late is artwork that misses the season.

PeriodSeasonal demand and ordering window
Sep – early NovCampaign changeover before the Christmas trading period; artwork approved by late October clears proofing and freight in time.
mid-Nov – early JanChristmas markets and festive pattern work; the largest seasonal window.
Feb – MarTrade-fair builds and spring launches; short lead times outweigh unit price.
Jun – AugTerrace season for hospitality interiors and evening frontage work.
§ 04
Models / extract

Models from the index sold in this market.

Extracted from the full index; specification tables are on each model page.

Model index

No.PlateCodeDesignationOutputNotes
01 IL-15 Interior Gobo Light IL-15 Interior Gobo Light 15 WShort-throw mark projection for counters, display walls and exhibition panels. →
02 OL-100 Exterior Logo Projector OL-100 Exterior Logo Projector 100 WWeather-sealed frontage unit for logos on pavements and external walls. →
03 HP-300 Large-Format Gobo Projector HP-300 Large-Format Gobo Projector 300 WEven illumination across very large surfaces for landmark and festival work. →
§ 05
Enquiry / record

Questions answered before ordering.

Anything not covered here goes to the enquiry form and is answered within one working day.

Is the CE declaration issued with the shipment?

Yes, referenced to the model codes and the order number, together with the RoHS declaration and a test-report extract. If the specifying engineer requires a particular standard cited — EN 60598-1 and EN 60598-2-5 are the usual references for this product type — state it before production begins.

Is DDP available into the EU?

It is, through our forwarder, with import VAT and duty settled before delivery. Most established importers take DAP and clear on their own VAT number, which is usually the cheaper route; both are quoted so the landed cost can be compared directly.

What is the working lead time for a seasonal campaign?

Proof within 24 hours, gobo production in 3–5 working days, then 30–40 days of sea freight or 18–24 days by rail. Work backwards from the installation date and allow a week of customs buffer.

Enquiry / No. 01

Specify for Europe & the UK.

Send the distance, the surface and the artwork. The reply includes the model, the documentation route and a landed-cost estimate.

Open an enquiry →
GOBO
↑